{"id":335,"date":"2021-04-13T10:21:33","date_gmt":"2021-04-13T07:21:33","guid":{"rendered":"https:\/\/hygger.io\/guides\/?p=335"},"modified":"2021-11-30T13:18:28","modified_gmt":"2021-11-30T10:18:28","slug":"project-plan","status":"publish","type":"post","link":"https:\/\/hygger.io\/guides\/agile\/project-management\/project-plan\/","title":{"rendered":"Project Plan"},"content":{"rendered":"<p><span data-preserver-spaces=\"true\">All project managers around the globe know that there\u2019s no such thing as a prosperous project without an efficient plan behind it. What is the role of planning in\u00a0<\/span><a class=\"editor-rtfLink\" href=\"https:\/\/hygger.io\/guides\/agile\/project-management\/\" target=\"_blank\" rel=\"noopener\"><span data-preserver-spaces=\"true\">Agile project management<\/span><\/a><span data-preserver-spaces=\"true\">?<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-21060\" src=\"https:\/\/hygger.io\/wp-content\/uploads\/2021\/04\/73.png\" alt=\"Project plan\" width=\"1500\" height=\"900\" \/><\/p>\n<h3>The Power of Project Planning<\/h3>\n<p>Initiating a project without a plan is like going to a ski resort without skis. Perhaps you will be able to somehow spend time there, but you will definitely not get the expected result.<\/p>\n<p>They say many common project failure reasons could have been resolved through better planning of your projects. If there is no clear project plan in your arsenal, you may face scope creep, missed deadlines, and lost budgets. By putting together a project plan before you start repairing a car bridge or writing the code, you can set expectations that will lead to success.<br \/>\nHow to create a killer project plan? What should a project plan include? How to define the elements of a project plan? How long does the project planning phase take?<\/p>\n<p>So many questions should not stay unanswered. Let&#8217;s figure them out without wasting time!<\/p>\n<h2>What is Project Planning?<\/h2>\n<p>Project planning is a discipline for stating how to complete a particular project within the expected timeframes, usually with specific resources and defined stages. The process of project planning may include setting objectives, identifying deliverables, scheduling, and creating supporting plans. The result of this essential process is a project plan.<\/p>\n<h2>What Is a Project Plan?<\/h2>\n<p><span data-preserver-spaces=\"true\">A project plan is a formal document aimed to guide the project control and its execution. It visualizes each step to take a project from A to B.<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">In the IT world, the project plan often refers to a Gantt chart or any other form that demonstrates project activities along a timeline. However, we will not consider these documents as a project plan and will observe the subject wider. Project plans may display specific phases of the project, core activities, start and end dates,\u00a0<\/span><a class=\"editor-rtfLink\" href=\"https:\/\/hygger.io\/guides\/agile\/project-management\/dependencies\/\" target=\"_blank\" rel=\"noopener\"><span data-preserver-spaces=\"true\">dependencies management<\/span><\/a><span data-preserver-spaces=\"true\">, and milestones.\u00a0<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">A project plan should help the team to:<\/span><\/p>\n<ul>\n<li><span data-preserver-spaces=\"true\">Communicate project expectations to stakeholders;<\/span><\/li>\n<li><span data-preserver-spaces=\"true\">Control schedules and delivery;<\/span><\/li>\n<li><span data-preserver-spaces=\"true\">Predict and manage possible risks.<\/span><\/li>\n<\/ul>\n<h3>Associated terms<\/h3>\n<ul>\n<li><strong><span data-preserver-spaces=\"true\">Task<\/span><\/strong><span data-preserver-spaces=\"true\">\u00a0&#8211; a small job that leads to the final deliverable.<\/span><\/li>\n<li><strong><span data-preserver-spaces=\"true\">Deliverable<\/span><\/strong><span data-preserver-spaces=\"true\">\u00a0&#8211; the result of a project (product, service, report, etc).<\/span><\/li>\n<li><strong><span data-preserver-spaces=\"true\">Resource\u00a0<\/span><\/strong><span data-preserver-spaces=\"true\">&#8211; anything you need to complete the project (from the tools to supplies).<\/span><\/li>\n<li><strong><span data-preserver-spaces=\"true\">Stakeholders<\/span><\/strong><span data-preserver-spaces=\"true\">\u00a0&#8211; individuals who have a real interest in the project (sponsors, a project manager, team members, customers, etc).<\/span><\/li>\n<li><strong><span data-preserver-spaces=\"true\">Milestone\u00a0<\/span><\/strong><span data-preserver-spaces=\"true\">&#8211; the point that visualizes the end of one project phase and the beginning of the next one.<\/span><\/li>\n<li><strong><span data-preserver-spaces=\"true\">Budget<\/span><\/strong><span data-preserver-spaces=\"true\">\u00a0= costs, all money required to complete the project.<\/span><\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-336 size-full\" src=\"https:\/\/hygger.io\/guides\/wp-content\/uploads\/2021\/04\/64-project-control-1.png\" alt=\"Agile projects planning\" width=\"2475\" height=\"1650\" srcset=\"https:\/\/hygger.io\/guides\/wp-content\/uploads\/2021\/04\/64-project-control-1.png 2475w, https:\/\/hygger.io\/guides\/wp-content\/uploads\/2021\/04\/64-project-control-1-300x200.png 300w, https:\/\/hygger.io\/guides\/wp-content\/uploads\/2021\/04\/64-project-control-1-1024x683.png 1024w, https:\/\/hygger.io\/guides\/wp-content\/uploads\/2021\/04\/64-project-control-1-768x512.png 768w, https:\/\/hygger.io\/guides\/wp-content\/uploads\/2021\/04\/64-project-control-1-1536x1024.png 1536w, https:\/\/hygger.io\/guides\/wp-content\/uploads\/2021\/04\/64-project-control-1-2048x1365.png 2048w\" sizes=\"auto, (max-width: 2475px) 100vw, 2475px\" \/><\/p>\n<h3>Project Plan Components: What Is in?<\/h3>\n<p><span data-preserver-spaces=\"true\">A well-composed project plan should answer the classical questions that start with the words Who, What, Where, Why, How, and When. The key goal of the project plan is to guide the execution and control of project phases. It typically consists of the documents that include:<\/span><\/p>\n<ul>\n<li><strong><span data-preserver-spaces=\"true\">Project charter<\/span><\/strong><span data-preserver-spaces=\"true\">, where you will find an overview of the project and the important information about all stakeholders, measurable project goals, objectives, constraints, and reasons.<\/span><\/li>\n<li><strong><span data-preserver-spaces=\"true\">SoW<\/span><\/strong><span data-preserver-spaces=\"true\">\u00a0(statement of work) with the info about the scope of the project, relevant schedules, deliverables, milestones, and tasks.<\/span><\/li>\n<li><strong><span data-preserver-spaces=\"true\">WBS<\/span><\/strong><span data-preserver-spaces=\"true\">\u00a0(work breakdown structure) where the project scope is broken down into smaller phases, subprojects, or deliverables.<\/span><\/li>\n<li><strong><span data-preserver-spaces=\"true\">Project plan<\/span><\/strong><span data-preserver-spaces=\"true\">\u00a0containing such elements as scope management, quality management, risk assessment, stakeholder management, schedules, and the change management plan.<\/span><\/li>\n<\/ul>\n<h2>Thorough Plan Against Project Chaos<\/h2>\n<h3>Why project planning matters<\/h3>\n<p><span style=\"font-weight: 400;\">Customers always want to know the answers to the following questions:<\/span><\/p>\n<ul>\n<li><span style=\"font-weight: 400;\">How much will my project cost?<\/span><\/li>\n<li><span style=\"font-weight: 400;\">When will the project be d<\/span><span style=\"font-weight: 400;\">elivered?<\/span><\/li>\n<li><span style=\"font-weight: 400;\">How will it be delivered?\u00a0<\/span><\/li>\n<\/ul>\n<p>The list goes on and on. <span style=\"font-weight: 400;\">Consumers logically want to know everything before signing off. When you ignore project planning, it\u2019ll be difficult for you to answer those common questions.\u00a0<\/span><\/p>\n<p>Innovative spheres with complex projects require new approaches to project planning. Today an efficient project plan is no more a static document, but an accessible, understandable, and highly adaptable structure.<\/p>\n<p>Well-developed project plans will bring obvious benefits to the projects. Here are 7 reasons why you should care about this process:<\/p>\n<h3>7 reasons why a good project plan matters<\/h3>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Clarifies activities and processes, leading to better deliverables.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Specifies the information for better estimation and defining project scope.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Enables teams to visualize the whole project and understand the interdependencies between tasks.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Forecasts resource requirements.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Allows milestones for tracking the progress.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Allows tracking of the project progress.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Enables the agreement of all important dates.<\/span><\/li>\n<\/ol>\n<h3>What Is the Purpose of the Project Plan?<\/h3>\n<p>The main idea of any project plan is to guide the execution and control phases. The doc provides all the necessary information for the execution phase that assists project managers in monitoring and controlling the progress of their projects.<\/p>\n<p>A thorough project ensures that you will not worry about whether the project participants are going to be available on the right dates. Good plans describe the processes that everyone should follow. They will help to avoid a lot of trouble and the headache of the PM.<\/p>\n<h2>5 Phases of Projects<\/h2>\n<p><span data-preserver-spaces=\"true\">How do you usually create an Agile project? Naturally, you start with a plan. Any project has the potential to be complex despite its origin. No matter it is small or big, it is worth breaking down the elements for a plan by viewing the project in terms of certain phases.<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">The well-known PMBOK defines five consistent phases or stages of a project:<\/span><\/p>\n<ul>\n<li><span data-preserver-spaces=\"true\">The\u00a0<\/span><strong><span data-preserver-spaces=\"true\">Initiation stage<\/span><\/strong><span data-preserver-spaces=\"true\">\u00a0is the very first point of the project planning process. It includes identifying the goals and objectives and describes the projects&#8217; practicality.<\/span><\/li>\n<li><strong><span data-preserver-spaces=\"true\">Planning<\/span><\/strong><span data-preserver-spaces=\"true\">\u00a0is the next stage that contains defining WBS and choosing a PM methodology to manage the project. You should know how to estimate quality, costs, and resources as well as how to schedule considering task dependencies and milestones.<\/span><\/li>\n<li><span data-preserver-spaces=\"true\">The\u00a0<\/span><strong><span data-preserver-spaces=\"true\">Execution phase<\/span><\/strong><span data-preserver-spaces=\"true\">\u00a0of planning embodies the completion of project deliverables. During this stage, your team has to run a kick-off meeting and other regular meetings.<\/span><\/li>\n<li><strong><span data-preserver-spaces=\"true\">Monitoring and controlling<\/span><\/strong><span data-preserver-spaces=\"true\">\u00a0can not be underestimated. You can run this phase with the Execution phase in tandem. Measure the significant metrics of progress and performance to keep progress on your project aligned with the initial plan.<\/span><\/li>\n<li><span data-preserver-spaces=\"true\">The\u00a0<\/span><strong><span data-preserver-spaces=\"true\">Closure of the project<\/span><\/strong><span data-preserver-spaces=\"true\">\u00a0is the final step when stakeholders receive the final deliverable. Now the project can be completed. All resources should be released and the final contract should be signed off. The only thing left is the evaluation of the successes and failures.<\/span><\/li>\n<\/ul>\n<p><span data-preserver-spaces=\"true\">It is worth organizing your tasks and planning all the processes with the help of appropriate project management software. For example, the feature set of Hygger.io is far more powerful and integrated with every project phase compared to an Excel template. This is a great way to ensure that your actual progress stays aligned with your planned progress.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-337 size-full\" src=\"https:\/\/hygger.io\/guides\/wp-content\/uploads\/2021\/04\/yx14wlbbgdr6klphbr5dhapmflokbmjqkngacks1.png\" alt=\"PM plan\" width=\"1500\" height=\"900\" srcset=\"https:\/\/hygger.io\/guides\/wp-content\/uploads\/2021\/04\/yx14wlbbgdr6klphbr5dhapmflokbmjqkngacks1.png 1500w, https:\/\/hygger.io\/guides\/wp-content\/uploads\/2021\/04\/yx14wlbbgdr6klphbr5dhapmflokbmjqkngacks1-300x180.png 300w, https:\/\/hygger.io\/guides\/wp-content\/uploads\/2021\/04\/yx14wlbbgdr6klphbr5dhapmflokbmjqkngacks1-1024x614.png 1024w, https:\/\/hygger.io\/guides\/wp-content\/uploads\/2021\/04\/yx14wlbbgdr6klphbr5dhapmflokbmjqkngacks1-768x461.png 768w\" sizes=\"auto, (max-width: 1500px) 100vw, 1500px\" \/><\/p>\n<h2>What Are the Consistent Steps of Planning Projects?<\/h2>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Outlining the business case.<\/b><span style=\"font-weight: 400;\"> If you kick off a project, then you have a clear reason to do it. This is your business case. It should outline why the project is being initiated, its benefits, and the return on investment.\u00a0<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Gathering stakeholders.<\/b><span style=\"font-weight: 400;\"> There is no project without involved stakeholders, that have a vested interest in it. The list of stakeholders includes the ones who profit from the project and the ones who are responsible for its success. Meeting with them is crucial to get a better understanding of what is expected from the final deliverable.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Defining the scope.<\/b><span style=\"font-weight: 400;\"> The scope of the project should be defined and organized by WBS (work breakdown structure).\u00a0<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Defining key goals\/objectives.<\/b><span style=\"font-weight: 400;\"> The common goals of the project contain the results you want to get. Objectives are usually more specific. They should be measurable actions that must be taken to reach your goal. Goals plus objectives should be collected in a project charter.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Outlining deliverables.<\/b><span style=\"font-weight: 400;\"> A deliverable can be a product, service, or even result that is needed to complete a task, phase, process, or the entire project.\u00a0<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Scheduling.<\/b><span style=\"font-weight: 400;\"> You should prepare a schedule by collecting all the tasks needed to reach your final deliverable and setting them on a timeline.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Assigning tasks<\/b><span style=\"font-weight: 400;\">. Until you assign tasks to your team, your project plan still exists in the abstract. Your colleagues&#8217; roles and their direct responsibilities must be clearly defined, so they know what to do.\u00a0<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Assessing risks.<\/b><span style=\"font-weight: 400;\"> There are several types of risk (technical risk, scope risk, schedule risk, etc.) and many internal and external factors can impact your project\u2019s time, scope, and costs.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Reporting progress.<\/b><span style=\"font-weight: 400;\"> Regular meetings where you will share progress reports are a great way to demonstrate to stakeholders that everything is moving forward as planned.<\/span><\/li>\n<\/ol>\n<h3>The components of a project plan also matter<\/h3>\n<p><span style=\"font-weight: 400;\">Project plans consist of many subsidiary elements, including:<\/span><\/p>\n<ul>\n<li><span style=\"font-weight: 400;\">a communication plan that defines who will receive messages about the project, when, and in what specific format.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">a plan for managing costs and the budgeting elements of the project.\u00a0<\/span><\/li>\n<li aria-level=\"1\"><span style=\"font-weight: 400;\">a plan for managing associated risks.\u00a0<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">a quality plan defining the quality targets for the project.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">a plan for managing HR issues.\u00a0<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">The project plan must include enough information to make sure that you know exactly what processes need to be followed and who should be involved.<\/span><\/p>\n<h3>Before starting a project plan<\/h3>\n<p><span data-preserver-spaces=\"true\">Before preparing your brilliant project plan, pay attention to the following points related to project planning:<\/span><\/p>\n<ul>\n<li><span data-preserver-spaces=\"true\">A project plan is more than a roadmap. If you want to give customers a complete view of your project, combine it with an estimate and a statement of work.<\/span><\/li>\n<li><span data-preserver-spaces=\"true\">Remember that project planning takes time. It is not a one-time thing, as you will continually refine it after creation.<\/span><\/li>\n<li><span data-preserver-spaces=\"true\">Do not waste much effort making something that only you will see. Turn your plan into a presentation for customers to let them better understand the limitations and the scope of work.<\/span><\/li>\n<\/ul>\n<h2>9 Steps to Prepare a Successful Project Plan<\/h2>\n<h3>1. Have a 100% understanding of your project scope and all values<\/h3>\n<p>The plan of your project is a starting point on the way your team will act managing the project in accordance with its scope. The goal of this plan is to communicate important information to stakeholders and all the people involved. It should not be dry and boring. This document should reflect all aspects properly, so then it will become an integral part of your project\u2019s success.<\/p>\n<p>The project plan is like a story of your project. Therefore do not make it a tale without a clear plot. Only a viable and strategic plan for the project will benefit you.<\/p>\n<h3>2. Initiate research<\/h3>\n<p>By knowing all important aspects of the project you will be able to start planning without extra headache. Study all communications and available documents relevant to your project. Pay special attention to the scope of work and the notes if they exist. If needed, ask thoughtful questions and do not forget about your customers&#8217; needs and expectations. Initiating a project plan, project managers must be well-informed and methodical.<\/p>\n<h3>3. Ask more questions to receive more useful facts<\/h3>\n<p>It is also crucial to find time for communication with your customers in order to ask them questions about the process, organizational politics, and possible risks. Your team should be able to demonstrate that it can handle difficult situations and that every team member cares enough about the overall success of the project.<\/p>\n<p>There are some common questions that will help you to influence the successful project plan completion. Here are some of them:<\/p>\n<ul>\n<li>How would you like to get feedback?<\/li>\n<li>What is the preferred way of communication?<\/li>\n<li>What project deadlines will be appropriate?<\/li>\n<li>What is the list of stakeholders?<\/li>\n<li>Who is the owner of the project?<\/li>\n<li>Are there any dates when you will be unavailable?<\/li>\n<li>Has the team experience in launching a project like this in the past?<\/li>\n<li>What can disturb the project&#8217;s success?<\/li>\n<\/ul>\n<h3>4. Create the outline<\/h3>\n<p>Now you have all the required answers, and it is time to apply all these general answers to your specific project, which is already waiting for your participation. Review the objectives that are outlined in the scope of work. Then compose a high-level outline to generate a project management approach. Simple calendars will help you to check dates.<\/p>\n<p>What should this outline include? First of all, these are tasks and deliverables, ideas on resources needed for tasks, the customer\u2019s approval process, all timeframes, assumptions you are making in the plan, budget issues, and so on. With the help of the outline, you will systemize your thoughts and transform everything into a healthy discussion.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-339 size-full\" src=\"https:\/\/hygger.io\/guides\/wp-content\/uploads\/2021\/04\/11147477fe44fa256e448aa0a60ed0e1-scaled.jpg\" alt=\"how to plan projects?\" width=\"2560\" height=\"1536\" srcset=\"https:\/\/hygger.io\/guides\/wp-content\/uploads\/2021\/04\/11147477fe44fa256e448aa0a60ed0e1-scaled.jpg 2560w, https:\/\/hygger.io\/guides\/wp-content\/uploads\/2021\/04\/11147477fe44fa256e448aa0a60ed0e1-300x180.jpg 300w, https:\/\/hygger.io\/guides\/wp-content\/uploads\/2021\/04\/11147477fe44fa256e448aa0a60ed0e1-1024x614.jpg 1024w, https:\/\/hygger.io\/guides\/wp-content\/uploads\/2021\/04\/11147477fe44fa256e448aa0a60ed0e1-768x461.jpg 768w, https:\/\/hygger.io\/guides\/wp-content\/uploads\/2021\/04\/11147477fe44fa256e448aa0a60ed0e1-1536x922.jpg 1536w, https:\/\/hygger.io\/guides\/wp-content\/uploads\/2021\/04\/11147477fe44fa256e448aa0a60ed0e1-2048x1229.jpg 2048w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/p>\n<h3>5. Communicate<\/h3>\n<p>Communication is a magic key to success. Every project manager, starting a project, must have strong skills in communication to transmit project goals and the effort required to meet them.<\/p>\n<p>However, remember, that PMs are not the only people responsible for generating a project plan. Use the project plan review time to push your Agile team to take a new approach to the work.<\/p>\n<h3>6. Schedule the project plan<\/h3>\n<p>After gathering all the required info and communicating with all parties, you should feel comfortable enough to compile a rock-solid project schedule. Implement any handy tool to do it professionally. Appropriate software will help you to structure and optimize your thoughts and direct them in a consistent direction. To make your project plan consistent and readable, check all dates, tasks, durations, and milestones. Make your project plan as simple as possible, then it will be more clear and straightforward. Include all essential project info such as a project name, customer&#8217;s name, the number of versions, delivery date, and so on.<\/p>\n<p>Make sure you are flexible enough when it comes to the way of presenting your project plan. There is no ideal format relating to how you represent your plan as long as your team understands what goes into one. People tend to perceive information differently. Some of them prefer a list-view, while others want to see a calendar or a Gantt chart.<\/p>\n<h3>7. Select a handy tool<\/h3>\n<p>Luckily, today some online project planning software solutions let you easily build a project plan without extra pain. A robust PM tool will assist you in creating Gantt diagrams according to the steps you\u2019ve outlined for your Agile team.<\/p>\n<h3>8. Publish the plan<\/h3>\n<p>After conducting the research, outlining your approach, discussing it with your team, and building your formal project plan, it is time to publish it. You may ask your colleagues to review the project plan before you share it with customers. It may take 10 or 20 minutes, but you will be sure that everything is alright.<\/p>\n<h3>9. Share it<\/h3>\n<p>Sharing the plan of your project plan with your colleagues is one of the fastest and simplest phases.\u00a0When you\u2019re communicating the plan, try to deliver its summary in a brief format. In your message, do not forget to mention the methodology, all assumptions, deadlines, resources used, and related review times.\u00a0<span style=\"font-weight: 400;\">At the very end, prepare yourself to keep planning.<\/span><\/p>\n<h2>The Role of Project Planning Software<\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-338 size-full\" src=\"https:\/\/hygger.io\/guides\/wp-content\/uploads\/2021\/04\/42fcd30799664a6288bdd0e14cd518c3-scaled.jpg\" alt=\"projetc planning software\" width=\"2560\" height=\"1536\" srcset=\"https:\/\/hygger.io\/guides\/wp-content\/uploads\/2021\/04\/42fcd30799664a6288bdd0e14cd518c3-scaled.jpg 2560w, https:\/\/hygger.io\/guides\/wp-content\/uploads\/2021\/04\/42fcd30799664a6288bdd0e14cd518c3-300x180.jpg 300w, https:\/\/hygger.io\/guides\/wp-content\/uploads\/2021\/04\/42fcd30799664a6288bdd0e14cd518c3-1024x614.jpg 1024w, https:\/\/hygger.io\/guides\/wp-content\/uploads\/2021\/04\/42fcd30799664a6288bdd0e14cd518c3-768x461.jpg 768w, https:\/\/hygger.io\/guides\/wp-content\/uploads\/2021\/04\/42fcd30799664a6288bdd0e14cd518c3-1536x922.jpg 1536w, https:\/\/hygger.io\/guides\/wp-content\/uploads\/2021\/04\/42fcd30799664a6288bdd0e14cd518c3-2048x1229.jpg 2048w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/p>\n<p><span style=\"font-weight: 400;\">Writing a project plan is only 50% of the success, and the second crucial part is its implementation.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In recent years, handy and powerful project planning software solutions have become an invaluable tool for project managers all over the world. They provide them with the ability to maintain and automate the components that were mentioned above.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">PM planning tools are great in facilitating management processes (for example, scheduling, team management, estimation costs, resource allocation, risk monitoring, etc).<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Online planning systems allow teams to track their plans as they move through the execution phase of the project. These solutions offer friendly dashboards that are utilized for a high-level view of the project\u2019s performance and progress. You also get in-depth reports that can be used to simplify communication with the stakeholders.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Some of the project planning tools focus on a single aspect, while others offer a suite of planning features that can be used in each one of the project planning steps.<\/span><\/p>\n<h3>How Project Planning Software Benefits Organizations<\/h3>\n<p><span data-preserver-spaces=\"true\">Online PM planning software is a flexible and handy system for any style of teamwork. Tools for planning provide features that help various teams to succeed in planning processes.<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">Some years ago, there were just a couple of professional tools, so project managers had to work in routing with lots of documents, excel spreadsheets, etc. Nowadays, PMs use innovative professional tools that can automate processes and assist in resolving challenges.<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">PM project planning systems provide evident benefits, such as:<\/span><\/p>\n<ul>\n<li><span data-preserver-spaces=\"true\">Tasks organizing and prioritization.<\/span><\/li>\n<li><span data-preserver-spaces=\"true\">Managing task dependencies.<\/span><\/li>\n<li><span data-preserver-spaces=\"true\">Tracking costs and resources.<\/span><\/li>\n<li><span data-preserver-spaces=\"true\">Sharing project plans.<\/span><\/li>\n<li><span data-preserver-spaces=\"true\">Dealing with milestones.<\/span><\/li>\n<li><span data-preserver-spaces=\"true\">Generating reports.<\/span><\/li>\n<li><span data-preserver-spaces=\"true\">Team collaboration.<\/span><\/li>\n<\/ul>\n<h3>What Features to Look for in Project Planning Software?<\/h3>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><a href=\"https:\/\/hygger.io\/guides\/agile\/project-management\/gantt-charts\/\"><span style=\"font-weight: 400;\">Gantt charts<\/span><\/a><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><a href=\"https:\/\/hygger.io\/guides\/agile\/kanban\/boards\/\"><span style=\"font-weight: 400;\">Kanban boards<\/span><\/a><\/li>\n<li><span style=\"font-weight: 400;\">Team management<\/span><\/li>\n<li aria-level=\"1\"><span style=\"font-weight: 400;\">Task lists<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Dashboard tracker<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Portfolio management<\/span><\/li>\n<\/ul>\n<h3>How Long Does the Project Planning Phase Last?<\/h3>\n<p>It always depends on the project itself. A good idea is to estimate the duration of your project planning phase by exploring similar projects that have happened before. Project managers should have a view on whether that length of time was enough or not. If your PM tool archives your old project schedules, it\u2019ll be easy to see how much time other projects took.<\/p>\n<h3>Some Final Thoughts About How to Manage the Project Plan<\/h3>\n<p>Do not forget to refer back to your project plan and initiate changes as often as required. The schedule of your project, for example, will face changes almost every day, while some other plan&#8217;s parts will not change during the project&#8217;s life (a procurement plan is a vivid example). A well-prepared project plan can be useful for guiding your project management.<\/p>\n<h4>Conclusion<\/h4>\n<p>Now you should be empowered with the process of right project planning and be able to lead your next project to success, as well as the next one after that. Hopefully, all your complex projects will become easier.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>All project managers around the globe know that there\u2019s no such thing as a prosperous project without an efficient plan behind it. What is the role of planning in\u00a0Agile project management? The Power of Project Planning Initiating a project without a plan is like going to a ski resort without skis. Perhaps you will be [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":342,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"class_list":["post-335","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v16.2 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<meta name=\"description\" content=\"How to plan Agile projects like a pro?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/hygger.io\/guides\/agile\/project-management\/project-plan\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"What is a project plan? - Hygger.io Guides\" \/>\n<meta property=\"og:description\" content=\"How to plan Agile projects like a pro?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/hygger.io\/guides\/agile\/project-management\/project-plan\/\" \/>\n<meta property=\"og:site_name\" content=\"Hygger.io Guides\" \/>\n<meta property=\"article:published_time\" content=\"2021-04-13T07:21:33+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-11-30T10:18:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/hygger.io\/guides\/wp-content\/uploads\/2021\/04\/agile.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1400\" \/>\n\t<meta property=\"og:image:height\" content=\"300\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\">\n\t<meta name=\"twitter:data1\" content=\"14 minutes\">\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/hygger.io\/guides\/#website\",\"url\":\"https:\/\/hygger.io\/guides\/\",\"name\":\"Hygger.io Guides\",\"description\":\"Hygger: Project Management Software &amp; Tools for Companies\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":\"https:\/\/hygger.io\/guides\/?s={search_term_string}\",\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/hygger.io\/guides\/agile\/project-management\/project-plan\/#primaryimage\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/hygger.io\/guides\/wp-content\/uploads\/2021\/04\/agile.png\",\"contentUrl\":\"https:\/\/hygger.io\/guides\/wp-content\/uploads\/2021\/04\/agile.png\",\"width\":1400,\"height\":300,\"caption\":\"Agile\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/hygger.io\/guides\/agile\/project-management\/project-plan\/#webpage\",\"url\":\"https:\/\/hygger.io\/guides\/agile\/project-management\/project-plan\/\",\"name\":\"What is a project plan? - Hygger.io Guides\",\"isPartOf\":{\"@id\":\"https:\/\/hygger.io\/guides\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/hygger.io\/guides\/agile\/project-management\/project-plan\/#primaryimage\"},\"datePublished\":\"2021-04-13T07:21:33+00:00\",\"dateModified\":\"2021-11-30T10:18:28+00:00\",\"author\":{\"@id\":\"https:\/\/hygger.io\/guides\/#\/schema\/person\/cab80745946cdf5feea0cee70ab6cffc\"},\"description\":\"How to plan Agile projects like a pro?\",\"breadcrumb\":{\"@id\":\"https:\/\/hygger.io\/guides\/agile\/project-management\/project-plan\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/hygger.io\/guides\/agile\/project-management\/project-plan\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/hygger.io\/guides\/agile\/project-management\/project-plan\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"item\":{\"@type\":\"WebPage\",\"@id\":\"https:\/\/hygger.io\/guides\/\",\"url\":\"https:\/\/hygger.io\/guides\/\",\"name\":\"\\u0413\\u043b\\u0430\\u0432\\u043d\\u0430\\u044f \\u0441\\u0442\\u0440\\u0430\\u043d\\u0438\\u0446\\u0430\"}},{\"@type\":\"ListItem\",\"position\":2,\"item\":{\"@id\":\"https:\/\/hygger.io\/guides\/agile\/project-management\/project-plan\/#webpage\"}}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/hygger.io\/guides\/#\/schema\/person\/cab80745946cdf5feea0cee70ab6cffc\",\"name\":\"Pavel Kukhnavets\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/hygger.io\/guides\/#personlogo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/1c304a131d7d560805a98b095abf6816b67434834ab4109340b1e6dfa4061a1b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/1c304a131d7d560805a98b095abf6816b67434834ab4109340b1e6dfa4061a1b?s=96&d=mm&r=g\",\"caption\":\"Pavel Kukhnavets\"},\"description\":\"Pavel is a Content Marketing Manager at Hygger.io &amp; Welldoneby.com, a project management tool loved both by tech and non-tech people. Pavel writes about the world of Agile project management, covering such topics as popular methodologies, frameworks, techniques, innovative tools, and much more that affect the overall efficiency and productivity of product teams.\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","_links":{"self":[{"href":"https:\/\/hygger.io\/guides\/wp-json\/wp\/v2\/posts\/335","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hygger.io\/guides\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hygger.io\/guides\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hygger.io\/guides\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/hygger.io\/guides\/wp-json\/wp\/v2\/comments?post=335"}],"version-history":[{"count":15,"href":"https:\/\/hygger.io\/guides\/wp-json\/wp\/v2\/posts\/335\/revisions"}],"predecessor-version":[{"id":914,"href":"https:\/\/hygger.io\/guides\/wp-json\/wp\/v2\/posts\/335\/revisions\/914"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hygger.io\/guides\/wp-json\/wp\/v2\/media\/342"}],"wp:attachment":[{"href":"https:\/\/hygger.io\/guides\/wp-json\/wp\/v2\/media?parent=335"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hygger.io\/guides\/wp-json\/wp\/v2\/categories?post=335"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}